CHINA CLASSIFICATION SOCIETY
 
Ship Survey Status on Line
 
 
Date:December 27, 2024
 
PARTICULAR

Name of Ship:  

Class No.:  
IMO No.:  

Type of Ship:  

Call Sign:  

Official No.:  
Flag:  
Port of Registration:  
Class Character and Notations:
 
   
Class Status:
Service Status:
Dual Class:
Double Class:
Registered Owner/Manager Information :
Registered Owner:
Address :
TEL/FAX/Contact person: / /
Ship Manager:
Address
TEL/FAX/Contact person: / /
DOC Holder/ISM Ship Manager:
Address :
TEL/FAX/Contact person: / /
Symbols may be used hereinafter:  
**, Survey Entered into Time Window ***, Certificate Expired or Survey Overdue
 
Declarations:
Class maintenance is subject to compliance with the requirements of China Classification Society's (CCS's) Rules and Regulations and the attention is drawn to that the following circumstances would result in the suspension, withdrawal or cancel of Class:
1. For all the ships classed with CCS, the class certificate will become invalid and the class will be automatically suspended in any one of the following cases:
  (1) When the special survey has not been completed within the period of time stipulated in the Rules and an extension is not granted by the Society, unless the vessel is under attendance for completion prior to resuming trading, by the due date;
  (2) When the Annual Survey has not been completed within three (3) months of the due date of the annual survey, unless the vessel is under attendance for completion of the Annual Survey;
  (3) When the Intermediate Survey has not been completed within three (3) months of the due date of the third annual survey in each 5-year special survey cycle, unless the vessel is under attendance for completion of the Intermediate Survey;
2. For all the ships classed with CCS, the Society may suspend the class of a ship if any one of the following cases is confirmed:
  (1) When the ship is operating beyond the service limitation defined by its class notation and other additional conditions as approved;
  (2) When the ship is failed to submit any damage, defect, breakdown or grounding, which could invalidate the conditions for which a class has been assigned, for examination upon the first opportunity or, if proposed repairs have not been submitted to CCS and agreed upon prior to commencement;
3. For all the ships classed with this society, the class certificate may become invalid and the class may be suspended in any one of the following cases, unless the vessel is under attendance for completion of the surveys, by the due date:
  (1) When conditions of class or outstanding recommendations are not deleted by the due date and no extension has been granted;
  (2) When Continuous Survey items which are due or overdue at the time of Annual Survey are not completed and no extension has been granted;
  (3) When the other surveys required for maintenance of class, other than Annual, Intermediate or Special Surveys, are not carried out by the due date and no extension has been granted;
  (4) When repairs to any damage, defect, breakdown or grounding has not been completed as recommended and submitted for survey.
4. For all the ships classed with CCS, the Society may withdraw or cancel the class of a ship in any one of the following cases:
  (1) At the request of the Registered Owner;
  (2) If the circumstances leading to suspension of class are not corrected within the time specified, the vessel's class will be withdrawn;
  (3) A vessel's class is withdrawn immediately when a vessel proceeds to sea without having completed recommendations or conditions of class which were required to be dealt with before leaving port.
  (4) When class has been suspended for a period of six (6) months due to overdue Annual, Intermediate, Special or other surveys required for maintenance of class; or overdue outstanding recommendations/ conditions of class, class will be withdrawn. A longer suspension period may be granted for vessels which are either laid up, awaiting disposition of a casualty or under attendance for reinstatement.;
  (5) Where hull, equipment or machinery (including electrical installations) is so badly damaged or in other conditions (e.g. sinking, scrapping, etc.) that continuing operation of the ship is confirmed as not possible;
  (6) When the payment of survey fees is not made in time.
5. If, due to circumstances reasonably beyond the Registered Owner's or the Society's control (limited to such cases as: damage to the ship; unforeseen inability of the Society to attend the ship due to the governmental restrictions on right of access or movement of personnel; unforeseeable delays in port or inability to discharge cargo due to unusually lengthy periods of severe weather, strikes, or civil strife; acts of war, or other cases of force majeure) the vessel is not in a port where the overdue surveys can be completed at the expiry of the periods allowed, the Society may allow the vessel to sail, in class, directly to an agreed discharge port, and if necessary, hence, in ballast, to an agreed port at which the survey will be completed
6. If the survey requirements related to maintenance of special notations are not carried out as required, the suspension or withdrawal may be limited to those special notations only.
7. Withdrawal of the class of a ship will be indicated in the Register of Ships or its supplements or on the Society's website correspondingly.
8. When suspension or withdrawal of class of a ship becomes effective, the Society will send written notification to the Registered Owner and the Administration of the flag State, and make an announcement on CCS website available to the underwriters and other interested parties concerned.


 
Class Survey Information

Ship General Information:

Principal Particulars
Length(LOA):   Length(LBP):  
Moulded Breadth:   Moulded Depth:  
Deadweight: 76132 Scantling Draft(m):  

Tonnage
Regulation Gross Tonnage Net Tonnage
ITC 69 41684 25928
National (if any)    

Dates
Contract:   Keel Laid: 2013-4-30
Date of Built: 2013-12-2 Delivery:  
Date of Major Conversion* Contract   Date of Major Conversion* Completed  
Date of Major Conversion* Commenced      
* class related conversion only, and this is the Commencement date of major conversion

Builder
Builder Yard No.

Major Conversion Shipyard

Hull Characteristics:
Primary Material:

Condition(s) of Class:
Nil.

Class Memorandum:
Survey History:
Jobno Survey Date Survey Type